<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ERA</journal-id><journal-title-group><journal-title>Engineering Research and Application</journal-title></journal-title-group><issn>2995-3154</issn><eissn>2993-2742</eissn><publisher><publisher-name>Art and Design</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ERA.2025120037</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>膨胀加强带代替后浇带施工技术管理探索</title><url>https://artdesignp.com/journal/ERA/3/12/10.61369/ERA.2025120037</url><author>姚伟宙</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>3</volume><issue>12</issue><history><date date-type="pub"><published-time>2025-12-20</published-time></date></history><abstract>在超长混凝土结构施工中，传统后浇带技术因封闭周期长、清理困难、易形成渗水隐患及影响结构整体性与连续施工等问题，日益成为制约工程进度与质量的关键因素。文章以广东培正学院二期公共教学实验楼建设项目为案例，阐述了膨胀加强带在施工材料控制、温度裂缝防治、浇筑工艺、养护管理及细部节点处理等方面面临的管理难题。针对这些难题，提出了相应的解决措施，包括优化混凝土配合比与入模温度控制、精细化浇筑与振捣流程、实施全过程动态养护管理、强化构造设计与施工缝处理等。</abstract><keywords>膨胀加强带,后浇带,超长混凝土结构,大体积混凝土,裂缝控制</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1]庞戈,崔延珑,杜海,等.膨胀加强带代替后浇带可行性分析[J].建筑工程技术与设计,2020(6):366.[2]张敏.膨胀加强带代替后浇带的施工技术研究[J].江西建材,2021(6):118-119.[3]李冉,袁彬,李佳俊. 后浇带的优化&amp;mdash;&amp;mdash;膨胀加强带的实际应用[J].魅力中国,2021(20):490-491.[4]周昊男.膨胀加强带代替后浇带的施工方法[J].百科论坛电子杂志,2020(15):1522.[5]陈正磊,贾春明,关锁柱.地下室混凝土结构膨胀加强带代替后浇带施工技术研究[J].工程建设与设计,2023(21):187-189.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
