<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">ETQM</journal-id><journal-title-group><journal-title>Engineering Technology and Quality Management</journal-title></journal-title-group><issn>2995-3170</issn><eissn>2992-9806</eissn><publisher><publisher-name>Art and Design</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.61369/ETQM.2025110043</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>房屋建筑工程管理中的进度管理策略</title><url>https://artdesignp.com/journal/ETQM/3/11/10.61369/ETQM.2025110043</url><author>黄嘉亮</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>3</volume><issue>11</issue><history><date date-type="pub"><published-time>2025-11-20</published-time></date></history><abstract>文章系统阐述了建筑工程进度管理在房屋建筑项目中的关键意义，分析了影响施工进度的核心因素，并提出了系统化的管理措施。进度管理不仅直接影响业主的合约履行与经济效益，还关乎资源利用效率与项目成本控制。通过统筹人为、资源与技术等多重要素，构建科学的管理体系，能够有效保障工程按期高质量完成，提升建筑企业的综合管理水平与市场竞争力。</abstract><keywords>房屋建筑,工程管理,进度管理策略</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1]张志恒. 房屋建筑工程管理中的进度管理办法[J]. 建材与装饰,2024,20(18):76-78.&amp;nbsp;[2]钟勇文. 房屋建筑工程管理中的进度管理策略[J]. 建筑与装饰,2023(17):100-102.[3]张真真. 房屋建筑工程施工进度管理中面临的问题及对策研究[J]. 建材发展导向（上）,2019,17(8):350.&amp;nbsp;[4]魏菁华,裴羊羊. BIM技术在房屋建筑工程施工进度管理中的应用策略[J]. 产业创新研究,2024(2):112-114.[5]李超. 房屋建筑工程项目中的施工进度管理策略[J]. 建材与装饰,2024,20(33):127-129.&amp;nbsp;</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
